Cn
  • Safety Assessment of Wind Turbine Life Extension
  • Evaluation of Wind Power Technical Reform
  • Post-evaluation of wind farm
  • GWO Training Service Assessment
  • Photovoltaic power station acceptance
  • traffic product evaluation
The operation of several years of wind turbines, including the units health status, reliability, safety, key component life, unit remaining life assessment, and give follow-up rectification, regular inspection recommendations.

Before the technical renovation of the wind turbine, evaluate the technical renovation plan of the wind turbine, analyze the safety and risks of the technical renovation, and give the safety conclusion of the technical renovation plan; After the technical renovation of the prototype, the safety after the implementation of the technical renovation is evaluated and verified through actual measurement and data analysis and witness, and the effect of improving the power generation of the technical renovation is evaluated, so as to provide the basis for the owner to implement the subsequent technical renovation decision. It can be evaluated for various technical improvements such as unit power enhancement, controller localization, yaw wind, control system optimization, SCADA system optimization and upgrade, engine room radar wind measurement, etc.

Service Content

-Technical improvement plan review

-Verify and witness the effect of technological transformation

-Verify the security of technical transformation

The conducts a comprehensive and systematic review and summary of the project after the completion and acceptance of the wind farm project, and comprehensively and systematically compares the project implementation process and the final results and effects after the completion of the project with the plans and objectives determined during the project decision-making, finds out the differences, analyzes the reasons, draws experiences and lessons, and puts forward suggestions for improvement.

GWO (International Wind Energy Organization) is an international organization initiated by global wind power manufacturers and operators. It is mainly committed to safe operation and injury-free work of wind power sites. Through safety training and practical activities, reduce risks and control risks to help the wind power industry Establish a harmless working environment. In recent years, GWO has established a set of perfect personnel training standard system based on rich wind power training and practical experience. CCSC can perform all 6 GWO standards, a total of 16 modules of the assessment work.

According to the requirements of the project owner or the entrusting party, after the construction of the photovoltaic power station is completed, it is clear whether the power station meets the relevant performance indicators and quality requirements through testing and inspection of equipment performance, power station efficiency, construction quality, process document filing and other aspects.

Service Content

-Component appearance inspection

-Component power detection

-Component EL detection

-Inverter conversion efficiency test

-Inverter power quality test

-Power station efficiency test

-Ground test & polarity test

-Phalanx insulation test

-Conformance testing

-Document filing check

-BOM verification of key equipment

-Installation quality inspection

In-use car paint booth, comprehensive safety evaluation of lifts, safety acceptance of electric car charging facilities, comprehensive survey of electric car charging stations, operation safety inspection of in-service charging facilities, operation and maintenance safety inspection of electric car quick-change power stations, functional safety evaluation of intelligent transportation products (monitoring, driving, gates, etc.), functional safety evaluation of rail transit [signal products (transponders, automatic train monitoring system ATS, automatic train operation system ATO, rail circuits, etc.), urban rail transit doors/platform doors/screen doors, etc.]].